What the client needed
Rocky Mountain Institute (RMI) is assessing productive uses of energy in rural Zambia, such as irrigation and small enterprises, to understand how electrification could support local businesses.
Its planning workbook for three clusters, Chibombo-1, Kafue-62 and Rufunsa-61, relied on default assumptions about operating hours, loads, costs, ownership and finance. RMI needed verified, site-level data to refine its energy-system assumptions and capital expenditure estimates.
How M31 Research delivered
M31 Research uses a mixed-methods, site-level verification approach that combines questionnaires, interviews, focus group discussions, facility checks and direct observation. We adapt RMI's existing KoboToolbox form, prepare supplementary tools, obtain local permissions and train and pilot the field teams.
Three teams work in parallel across 14 sites, recording GPS locations, equipment details, photographs where consent is given, energy use and costs, and technical measurements where safe.
Daily quality checks, back-checks, data cleaning and geospatial verification feed into an updated workbook, with validated assumptions, cost estimates, scenarios and uncertainties.
What we delivered
- Inception report and workplan
- Adapted survey instruments and pilot package
- Research assistant training and pilot
- Fieldwork across 14 sites with daily progress and quality logs
- Clean, documented dataset and data dictionary
- Updated productive use of energy workbook
- Three cluster briefs, irrigation demand summary and final report
What changed for the client
RMI will have verified, geo-referenced data on productive uses of energy in all three clusters, replacing default assumptions in its workbook.
This will let RMI test demand and capital needs for productive use of energy and mini-grid investment with greater confidence.
Key findings and outcomes
- Site-level data verified across 14 sites
- Default planning assumptions replaced with field evidence
- Cluster briefs for Chibombo, Kafue and Rufunsa
- Stronger basis for electrification investment decisions
